August to September period, Wenzhou Low Voltage Electrical Apparatus Laboratory successfully completed the third phase of the life of 13 test port control circuit debugging work, together with the short circuit test before the completion of each port debugging, the laboratory's core short-circuit system and electrical life System control circuit has been fully debugged. Before May, the laboratory had verified the short-circuit ports by the low-voltage method and evaluated the impedance and acquisition system of the circuit. The results showed that the system met the design requirements under low-voltage conditions.
At this point, Wenzhou Low Voltage Electrical Laboratory Phase III project already has a full voltage power-on test conditions. (Ruian Office Wang Jianxin)
Basic Poster Stand,Basic Poster Bracket,Aluminum Extrusion Poster Frame,Outdoor Sign A3 Poster Stand
SUZHOU JH DISPLAY&EXHIBITION EQUIPMENT CO.,LTD , https://www.jh-snapframe.com