DCS Installation and Commissioning Considerations

DCS Installation and Commissioning Considerations General installation of DCS control systems is strictly regulated. It is particularly important to select construction units with good qualifications and construction experience. After the selection of the control system, the technical personnel of the construction unit shall be involved in the design of the control system, the construction drawings, the formulation of construction measures and technical training. Before the project is started, a strict schedule must be established according to the schedule requirements, and the construction unit must be required to organize the construction strength and come up with their construction plans. Therefore, pay special attention to the following issues during DCS installation and commissioning:

1. During construction, it is necessary to pay attention to the reliable insulation of the cabinet and the ground and the grounding of the busbars of the cabinet. At the same time, the holes must be fireproofed, and the cabinets must be protected against vibration.

2. When laying cables, special attention should be paid to the separation of strong electricity and weak electricity, and reliable grounding and anti-jamming of shielded cables. In the wiring process must be in accordance with the design drawing _ [, in the wiring, cable and core markings to be clear and complete, can be maintained for a long time; crimp terminals must be pre-installed with insulation tube end processing.

3, to strictly control the environmental conditions of electronic equipment, pay attention to do a good job of fire, air conditioning, ventilation and lighting work. Special mention should be made of ventilation and air conditioning. Since the DCS control system has strict temperature requirements, the air conditioning system should be put into operation as soon as possible. The air outlet of the air conditioner must not be facing the cabinet or other DCS electronic equipment, so as to avoid the condensation water from penetrating into the equipment. At the same time, electronic cards must not allow dust to enter. Therefore, it is required that the electronic environment can always keep the environment clean and the filter screen clean, and pay attention to dehumidification and adjustment of the temperature.

The DCS installation and commissioning can be imagined to the importance of production and ensure the smooth production. However, if you do not pay attention to the precautions of DCS installation and commissioning during the production process, it will easily cause errors in production and affect the production results.

HG Series-Up-acting Hybrid CNC Press Brake

An up-acting hybrid CNC Press Brake is a type of machine used in metalworking to bend and shape sheet metal. It is called a hybrid because it combines both hydraulic and electric servo technologies to operate. The up-acting design means that the ram (the part that applies force to the metal) moves upward, which allows for easier loading and unloading of the material being worked on.

The CNC (computer numerical control) aspect of the machine means that it is computer-controlled and can be programmed to perform precise bends and shapes. This makes it a highly efficient and precise machine for metalworking.

Some advantages of using an up-acting hybrid CNC press brake include:

- Improved accuracy and repeatability in bending and shaping metal
- Faster cycle times due to the use of electric servo technology
- Lower energy consumption compared to purely hydraulic machines
- Easier and safer loading and unloading of materials due to the up-acting design

Overall, an up-acting hybrid CNC press brake is a versatile and efficient machine for metalworking that combines the benefits of both hydraulic and electric servo technologies.

Up-Acting Hybrid Cnc Press Brake,4-Axis Cnc Bending Machines Press Brake,Hydraulic Plate Bender Press Brake Machine,4Axis And Crowing Cnc Press Brakes

FOSHAN RAGOS NC EQUIPMENT CO.,LTD. , https://www.ragosnc.com